Custom Home Under Construction in North York
Old Yonge
A modern custom home in the heart of North York that blends open-concept living with contemporary styling, designed for effortless living.
Project Type
Custom Home
Location
Old Yonge Street, North York, Toronto
Status
Under construction
Scope
Design & Build
Living Space
More than 8,000 sq ft
The home
Grand open spaces and tall ceilings, warmed by natural materials and millwork. The home has a three-car garage, a heated driveway and an elevator. Below, the basement has 11-foot ceilings, radiant heated floors in the slab, and a walkout at the back.
Build Log
How this house has come together so far
Spring 2026
Design begins
The first months were all on paper: where the house sits on the lot, how it works, and what the clients need from it.
End of July 2026
Committee of Adjustment approval
The design needed some variances, so it went to the Committee of Adjustment. It was approved on the first application.
Summer 2026
Tree protection
The tree protection zones were fenced before anything else happened on site. One zone at the front carries two kinds of fence, because it crosses the property line.
End of September 2026
Permits issued
From the first meeting to permits in hand was five to six months. From the street, the lot looked the same the whole time.
October 2026
Demolition and site preparation
The old house came down. The driveway was cut down to remove its slope, and a base of crushed stone went in so machines don’t get stuck and mud isn’t dragged across the street.
Late October 2026
Excavation and footings
The dig started at the basement walkout. The footings were formed and poured, with the drawings and the soil conditions checked before any concrete went in.
November 2026
Foundation walls
The forms for the foundation walls are going up. On this house they run full height, with the concrete carried all the way up to where the main floor starts.
Next: framing, and getting the house closed in before the first snowfall.
Design Decisions
Three decisions made before the dig
The driveway came down
The old house sat high relative to the street, so the driveway had a steep slope. It was one of the biggest issues with the property and one of the first things the design set out to fix. The driveway was brought down and flattened, which makes it bigger, lets it fit more cars, and makes it easier to use day to day. The garage sits underneath the main floor and above the basement, which gives a bigger main floor, a bigger basement and a more usable garage.
It also changed the ceilings. Every lot has an established grade, which is basically where the old house and driveway sat, and lowering the driveway doesn't move it. So the new house can start lower in the ground, and because height limits are measured from the established grade, the main and second floors get significantly higher ceilings.
The foundation walls run full height
The concrete goes all the way up to where the main floor starts. That gets the lumber further away from the ground and the moisture, which reduces the risk of rot, and it gives a solid base to build the house up from. The full account is in The Concrete on This House Doesn't Stop at the Ground.
The elevator was planned from the first drawing
The slab under the elevator gets its own footings and sits a foot lower than the rest of the basement, so there is no step walking in and out. The structure is reinforced around the shaft all the way up the house, and nothing can protrude into it. It isn't something that can be added later.
- For Six Months You Could Have Driven Past This Lot: the design and approvals before demolition.
- You Can Kill a Tree on a Construction Site Without Ever Touching It: the tree protection zones on this lot.
- The Two Ways to Price a Custom Home: why the slope of this lot couldn't be priced from a photo.
- What It's Actually Like to Build a Custom Home in North York.
See It in Person
Walk an active site with us
If you're planning a custom home, come see this one while it's being built. Leave your details and we'll call you.
Request a Call