
Home Additions & Second-Storey Additions in Toronto
Expansion that feels
like it was always there
Seamless additions designed to integrate with your existing architecture, not just attach to it.
Seamless by Design
Built to look like it
was always there
A great addition is invisible. Rooflines align. Materials match. Inside, every floor height, trim profile, and finish flows seamlessly from original to new.
Our design-build approach lets us study the existing architecture and design the addition as if it were part of the original plan. The measure of success is the point where old and new become indistinguishable.
Home Additions in Toronto
More room, without moving
Some homes don't need a renovation or a rebuild. They need an addition, to make room for how you live now. We design and build second-storey additions, rear additions and extensions in Toronto, whether that's a new floor, a rear extension or an entirely new wing.
Second-storey additions: the structure comes first
If it's a second storey on a bungalow, the first thing we check is whether the existing house can carry it. Often the first-floor structure needs reinforcing or replacing to take the new load. That is settled at the design stage, with the structural engineering, before anything is priced.
What the lot allows
Zoning can go either way. On a wide lot in North York, the rules sometimes let you build out more than what's there today. And where an addition goes past a limit, such as height, a setback or lot coverage, it needs a minor variance from the Committee of Adjustment, which adds two to four months at minimum. We check the zoning before a design is final, so the approvals are part of the plan.
When an addition isn't the answer
Sometimes the work needed to carry an addition comes close to rebuilding the floor underneath it. At that point it's worth comparing a whole-home transformation or a new custom home, and we'll tell you which way it should go. The full reasoning is in Is It Worth Renovating or Should You Rebuild?
One scope, one price, one team
The foundation requirements, the zoning compliance and every finish are resolved before construction begins. We work off a fixed price, so the number holds for the scope you agreed on. During construction Majid is on site daily, making sure the new structure ties into the existing one, and you receive a written progress report every Friday.
From Vision to Keys
How your addition takes shape
Initial Conversation
We start by understanding the need. More space for a growing family. A primary suite. A self-contained suite for parents. What your home is missing and how an addition resolves it.
Design
Majid studies your existing architecture: rooflines, proportions, interior character. He designs the addition as part of the original plan.
Preconstruction
Structural engineering, permit coordination, and detailed specification. Foundation requirements, zoning compliance, and every finish resolved before construction begins.
Construction
Majid is on site daily, ensuring the new structure integrates precisely with the existing one. Farbod manages scheduling and communication. Weekly Friday reports track every milestone.
Quality Assurance & Handover
Every connection between old and new is inspected: interior transitions, structural joints, exterior integration. A walkthrough confirms it all.
After the Keys
A 12-month warranty with scheduled check-ins. We monitor how the addition settles and integrates, ensuring long-term performance.

Questions
Addition questions we hear most
Can my house carry a second-storey addition?
That's the first thing we check. Adding a second storey to a bungalow often means reinforcing or replacing the first-floor structure so it can take the new load. The structural engineering is worked out at the design stage, before anything is priced.
Will a home addition need a variance?
It depends on the lot. If the addition goes past a zoning limit, such as height, a setback or lot coverage, it needs a minor variance from the Committee of Adjustment, which adds two to four months at minimum. On some wide lots, the zoning allows more than what's there today. Read how the Committee of Adjustment works.
Should I add on, or rebuild?
If the existing structure can carry the addition, adding on keeps the home and the street you already have. If the first floor would need to be largely rebuilt to carry it, a new build may give you a better result. We'll tell you which on the first walk. How to think through renovating or rebuilding.
How is a home addition priced?
We work off a fixed price. The foundation requirements, the zoning compliance and every finish are resolved before construction begins, and the price holds for the scope you agreed on. Fixed price and cost plus, compared.
Will the addition match the rest of the house?
That's the measure we hold it to. Rooflines align and materials match on the outside. Inside, floor heights, trim profiles and finishes carry from the original house into the new space.
What is the first step?
Send us a message and we'll come walk the house and the lot with you. We look at the structure and the zoning first, talk through what your home is missing, and tell you whether an addition is the right way to get it.
Expand with Intention
Let's talk about what's possible
Tell us about your residence and your vision for it. We'll discuss how an addition can honour your existing architecture and whether it's the right approach.
Start a Conversation